Key Information
End User
George Weston Foods
Capacity
2MW
Location
Vic
Industry Sector
Industrial
Commissioned
2020
Primary Fuel
Natural Gas
02
Project Overview
Drac were engaged to replace an existing Cummins 2MW gas generator with a Caterpillar 2MW generator in an existing peak loading cogeneration plant. This project involved the complete design, fabrication and installation of all required components including the gas system, cooling water system, exhaust system and heat recovery systems.
Given this installation involved fitting a new generator into an existing enclosure, designing and packaging the mechanical system within the pre-determined footprint it proved challenging. Through Drac Mechanical’s innovated design approach and skilled installation team, the installed solution proved to be compact system with full maintainability.
This cogeneration plant has been operating continuously since installation was completed in June 2020
Why Choose Us?
THE DRAC DIFFERENCE
We are the only company in the industry that can provide a true in-house offering. This allows us to control every level of our supply chain. That's why we're the industry leaders in quality and project delivery.
ON-TIME, ON-BUDGET
Our reputation is testimony to on time and on budget projects. We’ve never missed a deadline.
FULLY IN-HOUSE TEAM
We don’t subcontract out any part of the process or system. Everything is handled in-house by our team of experts.
COMMITMENT TO SAFETY
Our Zero harm attitudes ensure that we’re always providing a healthy and safe work environment. We continuously monitor how we can eliminate risks in the workplace.
PEACE OF MIND
Our team of expert engineers and technicians will handle any roadblocks quickly and efficiently. Our customer retention is testimony to this