Key Information
End User
Charter Hall
Capacity
5.0MVA
Location
Vic
Industry Sector
Commercial Construction
Commissioned
2023
Primary Fuel
Diesel
02
Project Overview
555 Collins is a modern office building located near Southern Cross Station within the Melbourne CBD.
Drac Mechanical was engaged by Prime Electrical to design, supply, install and commission the standby power generation system.
The project consists of two 2500kVA standby generators installed within an acoustically treated plantroom on level 35 of the building. Drac also designed and installed a fuel reticulation system consisting of a 25,000L bulk storage tank, the automated fuel control system and a generator master control system.
Why Choose Us?
THE DRAC DIFFERENCE
We are the only company in the industry that can provide a true in-house offering. This allows us to control every level of our supply chain. That's why we're the industry leaders in quality and project delivery.
ON-TIME, ON-BUDGET
Our reputation is testimony to on time and on budget projects. We’ve never missed a deadline.
FULLY IN-HOUSE TEAM
We don’t subcontract out any part of the process or system. Everything is handled in-house by our team of experts.
COMMITMENT TO SAFETY
Our Zero harm attitudes ensure that we’re always providing a healthy and safe work environment. We continuously monitor how we can eliminate risks in the workplace.
PEACE OF MIND
Our team of expert engineers and technicians will handle any roadblocks quickly and efficiently. Our customer retention is testimony to this