Key Information

End User
George Weston Foods

Capacity
2MW

Location
Castlemaine, Victoria

Industry Sector
Manufacturing and Industry

Commissioned
2020

Primary Fuel
Natural Gas
02
Project Overview
Drac were engaged to replace an existing Cummins 2MW gas generator with a Caterpillar 2MW generator in an existing peak loading cogeneration plant. This project involved the complete design, fabrication and installation of all required components including the gas system, cooling water system, exhaust system and heat recovery systems. Drac manufactured and installed all components in house. This cogeneration plant has been operating continuously since installation was completed in June 2020
03
A Word From Drac
Retrofitting a new generator into and existing enclosure installation is inherently challenging. We applied an innovative design approach which resulted in minimal interruption to site and a seamless integration with existing field equipment. The project was completed in a very short period of time in order to have the plant active by the summer of 2020/21. Michael Hodge, Lead Mechanical Engineer

Why Choose Us?
THE DRAC DIFFERENCE
We are the only company in the industry that can provide a true in-house offering. This allows us to control every level of our supply chain. That's why we're the industry leaders in quality and project delivery.

ON-TIME, ON-BUDGET
Our reputation is testimony to on time and on budget projects. We’ve never missed a deadline.

FULLY IN-HOUSE TEAM
We don’t subcontract out any part of the process or system. Everything is handled in-house by our team of experts.

COMMITMENT TO SAFETY
Our Zero harm attitudes ensure that we’re always providing a healthy and safe work environment. We continuously monitor how we can eliminate risks in the workplace.

PEACE OF MIND
Our team of expert engineers and technicians will handle any roadblocks quickly and efficiently. Our customer retention is testimony to this
Our Partners
TRUSTED BY